Space TimelineSpace Timeline

Building Validations

Introduction

Form validations provide BDs the ability to control what the Advisor must fill out in a form before the form proceeds to the next step (eSign, wet signature, etc.).  Form validation should significantly reduce the number of NIGO (Not In Good Order)(s) that come through the system.

Table of Contents

Related Pages: