Building Validations
Introduction
Form validations provide BDs the ability to control what the Advisor must fill out in a form before the form proceeds to the next step (eSign, wet signature, etc.). Form validation should significantly reduce the number of NIGO (Not In Good Order)(s) that come through the system.